Main page › Guides › QBuild Cairns expansion

Queensland expands its Cairns modular housing factory

This is government-owned manufacturing capacity producing social housing and government employee housing. It is not a program a private buyer can purchase a home from.
Quick facts
Announced27 May 2026[1]
FacilityQBuild Rapid Accommodation and Apprenticeship Centre, Portsmith, Cairns[1][2]
ChangeAims to increase annual production by 40%[1]
From1 July 2026[1]
Output to date30 homes completed since manufacturing began in 2024[1]
Homes are used asSocial housing and accommodation for frontline workers[2]
Named manufacturing partners11 suppliers under a Standing Offer Arrangement, plus 7 identified to join progressively[2]
*Figures as published by the Queensland Government.

On 27 May 2026 the Queensland Government announced an expansion of QBuild's Portsmith manufacturing facility in Cairns, aiming to lift annual production of modular homes by 40% from 1 July 2026[1]. QBuild is the state's own builder, and the homes it makes there are social housing and accommodation for frontline workers — not houses a private buyer can order. The reason this belongs on a consumer site is different: it is one of the few places where an Australian government publishes a named list of the modular manufacturers it actually works with.

What was announced §

The Portsmith facility is a Rapid Accommodation and Apprenticeship Centre (RAAC), a QBuild manufacturing site that produces complete modular dwellings alongside sub-assemblies, and doubles as an apprenticeship training site[2]. The government says the expansion will also support more apprenticeship and training places in the far north[1].

The stated rationale is geographic rather than economic. Building offsite lets work continue through the wet season, and completed modules are transported and installed when remote communities are safely accessible — which the government presents as a way around severe weather disruption, freight delays and workforce shortages in Far North Queensland[1]. Locating the factory in Cairns rather than the south-east is described as reducing transport time into the communities the homes are destined for[1].

What "40%" does and does not tell you §

The figure is a target, not a result, and it is stated as a percentage without a baseline.

The one output figure published is that 30 homes have been completed since manufacturing began at the facility in 2024[1]. No annual production rate is given for the year before the expansion, and no post-expansion target number of homes is published. That means the 40% cannot responsibly be converted into a number of additional homes per year — the arithmetic would depend on a baseline the government has not stated.

Treat it as a direction of travel from a small base, which is what the published figures support, rather than as a volume commitment.

Who actually builds these homes §

This is the part with practical value. The department publishes the manufacturers engaged under a Standing Offer Arrangement for the MMC program — 11 named suppliers, plus 7 more identified through an open tender expression of interest to join progressively as the pipeline requires[2].

Engaged under the Standing Offer ArrangementIdentified to join progressively
Azura Building Group with Blok ModularAsset Cabins and Homes
AuscoATCO
FleetwoodHoek Modular Homes
Green Timber Technologies (GTT) with PrimeKerdic
Hutchies ModularMcHugh Steel
ModnPodsRendine
ModscapeUrbex
Saltair Modular
Sigma Build
Volo Modular
WestBuilt Homes

Names as published by the Queensland Department of Housing and Public Works, page last updated 23 July 2026[2].

What that list means is narrower than it looks. A company on it has satisfied a government procurement process for government work. That is a form of scrutiny, and it is publicly recorded, which is more than can be said for most claims a builder makes about itself. It is not an endorsement, it says nothing about how the company performs on private residential contracts, and it is not a substitute for checking the company's current licence and insurance yourself — see checking a prefab builder's licence and insurance.

Companies recorded as operating in Queensland are listed separately in our Queensland builder directory, which is compiled from published sources and not independently verified. The government list above is its own source and can be checked directly.

What this means for a private buyer §

Very little in the short term, and it is worth being clear about that rather than implying otherwise.

The indirect effect worth watching is on the supplier side. A named group of manufacturers building repeat standardised designs at volume is how a factory sector gets to scale, and that is the mechanism by which government programs eventually touch private prices — slowly, and not in a way any single announcement can be credited for.

What is not covered here §

The Dispatch — a monthly email when new guides are published. No noise; unsubscribe anytime.

Sent to info@modularlivingaustralia.com.au and handled by a person. See Privacy.

References §

  1. Queensland Government (Minister for Housing and Public Works) — Ministerial media statement, 27 May 2026 — 'Housing factory expansion fast-tracks new homes for regional and remote Queensland'. States the 40% target, the 1 July 2026 start, the 30 homes completed since 2024, and the reasons given for factory-built delivery in the far north. statements.qld.gov.au/statements/105167
  2. Queensland Department of Housing and Public Works — QBuild Modern Methods of Construction program page, last updated 23 July 2026 — describes the program, the Portsmith RAAC, the intended use of the homes, and names the manufacturing partners engaged under a Standing Offer Arrangement. housing.qld.gov.au/about/department/business-areas/public-works/qbuild/modern-methods-construction-program