Modular LivingAustralia

Main page › Guides › Aged care staff housing

Commonwealth grants now fund aged care staff housing

The grant program is open to aged care providers, not to individuals. Grant round dates on the department's page may have changed since publication; GrantConnect is the authoritative source for open rounds. Project details are as reported by trade press.
Quick facts
ProgramAged Care Capital Assistance Program (ACCAP)[1]
Staff accommodationAn eligible activity; the most recent round covers staff accommodation supporting residential aged care in regional, rural and remote areas[1]
Overall fundingUp to A$966.5 million over four years to 30 June 2028, then at least A$161 million a year from 2028–29[1]
Round 3 outcomeA$300 million to 66 infrastructure projects outside major cities, including staff accommodation[2]
Reported modular example11 modular staff homes beside an aged care home in Fitzroy Crossing, WA[3]

Aged care providers outside the major cities have long reported that they cannot staff a facility in a town where workers cannot find a home. The Commonwealth's main aged care capital grant program now treats that as an infrastructure problem: building staff accommodation is an eligible activity under the Aged Care Capital Assistance Program (ACCAP).[1]

What changed §

ACCAP funds the building, extension or upgrade of aged care services in places where older people have limited access, and lists staff accommodation among the eligible activities.[1] Its most recent round was framed around residential aged care and staff accommodation in regional, rural and remote areas.[1] The department reports that Round 3 allocated A$300 million to 66 projects outside major cities, including staff accommodation intended to help attract and retain workers.[2]

The program as a whole is funded at up to A$966.5 million over four years to 30 June 2028, and at least A$161 million a year from 2028–29.[1] Eligibility rules are set separately for each round and published on GrantConnect.[1]

A factory-built example §

Trade press reported in August 2026 that Western Australian not-for-profit provider Juniper had opened 11 modular staff homes — eight one-bedroom and three two-bedroom — beside its aged care home in Fitzroy Crossing in the Kimberley. The homes were built in Perth and transported to the town, with local trades preparing the site and connecting services. That project was funded through a separate Commonwealth program for flexible Aboriginal and Torres Strait Islander aged care.[3] The provider has also reported plans for modular homes in Katanning, Kununurra and Geraldton.[4]

The pattern — homes built in a metropolitan factory, trucked long distances, installed by a small local crew — is the same one that applies to a remote household build. The cost and logistics side is covered in module delivery, transport and craneage and building on rural land.

Why it matters to readers §

For individuals, the grants are not directly accessible: they go to aged care providers.[1] The relevance is indirect: it shows public money being used to buy small factory-built dwellings for remote sites, and it is a reminder that accommodation shared by unrelated workers can fall into a different building class from a house — see building classes for shared housing.

What is not covered here §

This page does not report which ACCAP Round 3 projects use modular or prefabricated construction, the cost of any staff housing project, or the current status of open grant rounds. The Fitzroy Crossing project details are as reported by trade press and were not verified against the provider's own records.

It does not cover state government key worker housing programs, or the eligibility criteria for any specific ACCAP round.

The Dispatch — a monthly email when new guides are published. No noise; unsubscribe anytime.

Sent to info@modularlivingaustralia.com.au and handled by a person. See Privacy.

References §

  1. Department of Health, Disability and Ageing — Aged Care Capital Assistance Program — grants for building, extending or upgrading aged care services and building staff accommodation in thin markets. Provision of staff accommodation is an eligible activity. The round 'Residential-based Aged Care Services and Staff Accommodation' (GO7524), up to $300 million, covered regional, rural and remote locations (MM 2 to MM 7), and metropolitan locations only for services providing specialised care for Aboriginal and Torres Strait Islander people. Overall funding up to $966.5 million over four years to 30 June 2028, then at least $161 million per year from 2028–29. Eligibility is set round by round in guidelines on GrantConnect. health.gov.au/our-work/aged-care-capital-assistance-program
  2. Department of Health, Disability and Ageing — 'Record $300 million to improve regional, rural and remote aged care' — ACCAP Round 3 funds 66 infrastructure projects outside major cities, including new or reopened beds and staff accommodation to help attract and retain workers. Publication date not shown on the page. health.gov.au/news/record-300-million-to-improve-regional-rural-and-remote-aged-care
  3. The Weekly SOURCE — 'Juniper opens 11 modular staff homes in outback town in WA', 12 August 2026 — trade press. Eight one-bedroom and three two-bedroom modular homes beside the Guwardi Ngadu Residential Aged Care Home in Fitzroy Crossing, built in Perth and transported in mid-2025, with local trades handling site preparation and services; funded through the Commonwealth's National Aboriginal and Torres Strait Islander Flexible Aged Care Services Program. theweeklysource.com.au/juniper-opens-11-modular-staff-homes-in-outback-town-in-wa/
  4. The Weekly SOURCE — 'Narrow margins blocking future aged care investment: Juniper', 29 August 2026 — trade press summary of the provider's annual report. States that work will also begin on modular homes in Katanning, Kununurra and Geraldton, with further regional locations under consideration. theweeklysource.com.au/narrow-margins-blocking-future-aged-care-investment-juniper/

Figures are as published by the sources above at their respective dates and are paraphrased summaries, not verbatim reproductions. Verify current pricing and rules directly with builders, lenders and planning authorities.