Government prefab programs by state
| Commonwealth support | A$54 m 2025 budget package, of which A$49.3 m is for state and territory prefab programs, according to trade press[1] |
|---|---|
| Commonwealth trials | A$39.3 m committed in May 2026 to trial the open-source System 600 platform, according to trade press[2] |
| States and territories with an identified program | NSW, Victoria, Queensland, Western Australia, South Australia, Tasmania and the ACT |
| No program identified | Northern Territory — not covered by sources compiled here |
Australian governments are backing prefabricated and modular construction through very different instruments: state-owned factories, manufacturer grants, factory tenders, loan guarantees and the relocation of existing homes. This page indexes what the sources compiled here show for each jurisdiction, with the status of each program and a link to the deeper guide where one exists. For the Commonwealth layer, see federal prefab funding.
Individual tenders and supplier lists arising from these programs are tracked on the prefab tenders and bids page.
State and territory programs at a glance §
| Where | Program | Status |
|---|---|---|
| Federal | 2025 prefab package; System 600 trials[1][2] | Committed |
| NSW | MMC Innovation Facility[3][4] | EOI closed Aug 2026 |
| NSW | Homes Reuse Program[5] | EOI closed Sep 2026 |
| VIC | Modular social housing[6] | Under way |
| QLD | QBuild modular program[7][8] | Operating |
| WA | Housing Innovation Fund[9][10] | Awarded |
| SA | Prefab tender and pilot[11][12] | Announced 2025 |
| SA | Ceduna modular homes[13] | Published |
| TAS | Finance guarantee[14][15] | Bill tabled Oct 2026 |
| ACT | No dedicated program[16] | Pending |
| NT | None identified | Not covered |
Program details by jurisdiction §
Commonwealth. The 2025 budget package was A$54 million, including A$49.3 million for state and territory prefab programs and a national certification process; a further A$39.3 million was committed to trial the System 600 platform, according to trade press.[1][2] Housing delivery is a separate matter from these commitments.
New South Wales — MMC Innovation Facility. A two-stage tender invites manufacturers to partner with government on a prefab and modular facility.[3] Stage one was an expression of interest for factories making components or large-scale modular housing, with possible finance, land or an offtake agreement and no stated dollar amount; it closed on 3 August 2026.[4]
New South Wales — Homes Reuse Program. Run by the NSW Reconstruction Authority, it relocates flood buyback homes and housing pods for social, affordable, transitional or key-worker use. It is open to housing providers, councils, not-for-profits and agencies, not individuals; the expression-of-interest window ran from 9 July to 17 September 2026.[5]
Victoria. More than 350 factory-built social homes are planned by mid-2028, built by Modularity by Rendine in Geelong. Trade press reported in August 2026 that more than 70 had been delivered and 136 were under construction.[6]
Queensland. QBuild, within the Department of Housing and Public Works, runs a government-owned modular factory in Cairns and engages further manufacturers under a Standing Offer Arrangement; the homes serve social housing and frontline-worker accommodation.[7][8] A 40% increase in annual production is targeted from 1 July 2026, with 30 homes completed since 2024.[7]
Western Australia. The Housing Innovation Fund Grant awarded A$49 million to local housing manufacturers, with recipients adding a 50% co-contribution.[9] Fifteen projects received up to A$5 million each, and applications are closed.[10]
South Australia — prefab tender and pilot. The SA Government announced a tender for 120 ready-to-occupy homes using prefab methods and a pilot of six modular homes from three builders, led by Renewal SA's Office for Regional Housing.[11] Renewal SA set out A$2.15 million for a proof of concept and a panel of pre-approved suppliers.[12] Later progress of the tender, pilot and display village is not covered by sources compiled here.
South Australia — Ceduna. The South Australian Housing Authority built four volumetric modular homes in a South Australian factory, funded with A$1.92 million from the Commonwealth Social Housing Accelerator Payment; the project page gives no dates.[13]
Tasmania. The Modular Housing Finance Guarantee would guarantee construction loans while a modular home is built off-site, limited to approved lenders and accredited Tasmanian builders.[14] It is a draft Bill; consultation closed on 4 September 2026, and limits and eligibility are to be set by regulation.[15]
ACT. No dedicated prefab program was identified. The Minister's answer to a question on notice reports two public housing dwellings completed with prefabricated construction in 2025-26, an application by Housing ACT to the Commonwealth Advancing Prefabricated and Modular Construction program, and that the ACT is considering joining a national platform with the Building 4.0 CRC. The source document is unsigned.[16]
Northern Territory. No program is covered by sources compiled here.
Share of social housing built with alternative methods §
Western Australia is the only jurisdiction found that states what share of its social housing construction uses modular or other alternative methods. In a media statement of 16 August 2026, the WA Government put the share of the Department of Housing and Works' social housing building program using alternative construction methods at close to 50 per cent; the housing minister, quoted in the same statement, put it at about half of new builds.[17] The statement does not define "alternative construction methods" or say whether the share is measured by number of homes or by value.[17]
The same statement announced 54 two-bedroom modular social homes for seniors across 17 Wheatbelt sites, to be manufactured by Modular WA for the community housing provider Central East Accommodation and Care Alliance, with A$16.96 million from the state and A$10.24 million from the Housing Australia Future Fund.[17] How that federal fund works for prefab suppliers is covered in HAFF Round 3 for prefab suppliers.
No equivalent official figure was found for New South Wales, Victoria, Queensland, South Australia, Tasmania, the ACT or the Northern Territory. Some publish counts of modular homes instead: for example, a Tasmanian Government release in August 2026 reported more than 280 modular homes delivered under the Tasmanian Government's ModHomes program.[18] A count of homes cannot be turned into a share of the construction program without the total, which that release does not give, so no share is stated here for any jurisdiction other than Western Australia.
Reading the table §
Four different models. Queensland operates government-owned manufacturing capacity.[7] Western Australia pays co-funded grants to private manufacturers.[9] New South Wales is seeking manufacturing partners through a tender and an expression-of-interest process.[3][4] Tasmania's draft instrument addresses finance for the build period rather than factory capacity.[14] These are not interchangeable: they create different demand and supply conditions for manufacturers, builders and lenders.
Buyers of the output are governments. Victoria's and Queensland's homes are for social housing and worker accommodation, and the NSW Homes Reuse Program is open to housing providers rather than individuals.[5][6][7] For manufacturers, these programs are procurement channels, not consumer demand.
Announced is not delivered. The NSW facility had no stated dollar amount in its expression-of-interest release,[4] Tasmania's guarantee is a draft,[15] and Victorian delivery figures come from trade press reporting of a ministerial visit.[6] Each linked guide separates committed from completed.
What is not covered here §
This page does not cover the Northern Territory. The only Territory government housing page found during research was undated and appeared to concern a program from around 2020, so it was left out. It also does not establish whether the Territory has since adopted a prefab-specific program.
It does not cover South Australian developments after mid-2025: whether the 120-home tender was issued, who was appointed to the supplier panel, or whether the display village opened. It does not cover how the A$49.3 million Commonwealth contribution to state and territory programs has been allocated between jurisdictions, nor the outcome of the ACT's funding application.
Local council programs, state land-release arrangements, planning pathways for modular housing and program details after the dates shown are also outside this page. It describes programs and does not advise any business on whether to take part in them.
Ask Modular Living AI about this guide
Still have a question after reading this guide? Ask it here. The answer draws on this guide, our other guides and the official pages they cite, with links to each one it used.
General information only, not legal, financial or building advice.
Sent to info@modularlivingaustralia.com.au and handled by a person. See Privacy.
References §
- Built Offsite — Trade press report on the 2025 federal budget: A$54 million for prefabrication and modular construction, made up of A$49.3 million for state and territory prefab programs and the remainder for a national certification process for off-site construction. builtoffsite.com.au/news/federal-government-backs-prefabrication-and-modular-construction-with-54-million-boost/
- Built Offsite — Trade press report, May 2026: A$39.3 million committed to trial the open-source System 600 kit-of-parts platform developed with the Building 4.0 CRC. builtoffsite.com.au/news/federal-government-commits-39-3m-to-open-source-prefab-housing-system-trials/
- NSW Government — Ministerial release, 'From factory to front door: plan to deliver homes faster in NSW', 21 June 2026 — announces the Modern Methods of Construction Innovation Facility and a two-stage tender for manufacturing partners. nsw.gov.au/ministerial-releases/from-factory-to-front-door-plan-to-deliver-homes-faster-nsw
- NSW Government — Ministerial release, 2 July 2026 — expressions of interest open for the Modern Methods of Construction Industry Expansion Program; seeks businesses to establish or expand NSW factories; closed 9:00am AEST Monday 3 August 2026; no dollar amount stated for the program; support may include finance, land or an agreement to buy output. nsw.gov.au/ministerial-releases/expressions-of-interest-open-for-future-of-housing-construction-nsw
- NSW Reconstruction Authority — Homes Reuse Program page — relocation of flood buyback homes and housing pods for social, affordable and key-worker use; eligible applicants are housing providers, councils, not-for-profits and NSW agencies; expression-of-interest window 9 July to 17 September 2026. nsw.gov.au/departments-and-agencies/nsw-reconstruction-authority/about-us/reconstruction/resilient-homes-program/homes-reuse-program
- Build Australia — Trade press report, 21 August 2026, on the Victorian modular housing push: more than 350 factory-built homes by mid-2028, built by Modularity by Rendine in Geelong, with 70+ delivered and 136 under construction. buildaustralia.com.au/news_article/modular-housing-push-delivers-more-than-350-new-homes-across-victoria/
- Queensland Government (Minister for Housing and Public Works) — Ministerial media statement, 27 May 2026 — QBuild's Cairns modular factory targets a 40% increase in annual production from 1 July 2026; 30 homes completed since manufacturing began in 2024. statements.qld.gov.au/statements/105167
- Queensland Department of Housing and Public Works — QBuild Modern Methods of Construction program page, last updated 23 July 2026 — describes the program and names the manufacturers engaged under a Standing Offer Arrangement; homes are used for social housing and frontline-worker accommodation. housing.qld.gov.au/about/department/business-areas/public-works/qbuild/modern-methods-construction-program
- Government of Western Australia — Media statement, 24 May 2026 — A$49 million awarded to local housing manufacturers under the Housing Innovation Fund Grant, with a 50% co-contribution from recipients. wa.gov.au/government/media-statements/Cook%20Labor%20Government/Cook-Government-delivering-$49-million-for-local-housing-manufacturers-20260524
- WA Department of Energy and Economic Diversification — Housing Innovation Fund Grant recipients page (last updated 24 May 2026) lists 15 projects with grants of up to A$5 million; the program page states applications are closed. wa.gov.au/organisation/department-of-energy-and-economic-diversification/housing-innovation-fund-grant-recipients
- Premier of South Australia — Media release, 'Prefab housing project launched ahead of industry roundtable' — announces a tender for 120 ready-to-occupy homes using prefab methods, and a modular pilot of six homes from three builders led by Renewal SA's Office for Regional Housing. The page gives the roundtable day (Thursday 19 June) but not the year. premier.sa.gov.au/media-releases/news-archive/prefab-housing-project-launched-ahead-of-industry-roundtable
- Renewal SA — News item dated 20 June 2025 — proposes a modular key-worker housing pilot with A$2.15 million to procure modular options as a proof of concept, a panel of pre-approved modular suppliers, and a display village expected between end-2025 and early 2026. renewalsa.sa.gov.au/news/modular-homes-could-solve-regional-woes
- South Australian Housing Authority — Ceduna special build page — four volumetric modular homes (two 2-bedroom, two 3-bedroom) for public housing allocated to Aboriginal people, made in a South Australian factory and funded with A$1.92 million from the Commonwealth Social Housing Accelerator Payment. housing.sa.gov.au/public-housing/our-special-builds/ceduna
- Premier of Tasmania — Media release, 3 June 2026 — announces the Modular Housing Finance Guarantee for construction loans while homes are built off-site, limited to approved lenders and accredited Tasmanian builders. premier.tas.gov.au/latest-news/2026/june/tasmania-unlocks-faster,-cheaper-housing-with-modular-finance-guarantee
- Department of Treasury and Finance (Tasmania) — Consultation page for the draft Modular Housing Finance Guarantee Bill 2026 — eligibility, limits and scheme requirements to be set by regulation; submissions closed 4 September 2026. treasury.tas.gov.au/budget-and-financial-management/modular-housing-finance-guarantee-bill-2026-consultation
- ACT Legislative Assembly — Answer to Question on Notice 211 (Minister for Housing and Homelessness, for the 30 July 2026 hearing) — two public housing dwellings completed using prefabricated construction in 2025-26; Housing ACT has applied to the Commonwealth Advancing Prefabricated and Modular Construction program; the ACT is considering joining a Building 4.0 CRC national platform. The signature and date fields on the document are blank. parliament.act.gov.au/__data/assets/pdf_file/0018/3113703/QON-211-Answer-CED-Pre-fabricated-housing-VASSAROTTI.pdf
- Government of Western Australia media statement — Largest-ever community housing modular project to create 54 homes (16 August 2026) — Says nearly 50 per cent of the Department of Housing and Works' social housing construction program is now delivered using alternative construction methods (bullet: almost half of new social homes; minister: about half of new builds). Announces 54 two-bedroom social homes for seniors across 17 Wheatbelt sites, built by Modular WA at its Wangara facility for Central East Accommodation and Care Alliance Inc; more than A$27 million in total, including A$16.96 million from the state and A$10.24 million from the Housing Australia Future Fund. wa.gov.au/government/media-statements/Cook%20Labor%20Government/Largest-ever-community-housing-modular-project-to-create-54-homes-20260816
- Premier of Tasmania — Modular construction helping us deliver more homes, faster for Tasmanians (17 August 2026) — Reports more than 280 modular homes delivered under the Tasmanian Government's ModHomes program; gives no share of total social housing construction. premier.tas.gov.au/latest-news/2026/august/modular-construction-helping-us-deliver-more-homes,-faster-for-tasmanians
Figures are as published by the sources above at their respective dates and are paraphrased summaries, not verbatim reproductions. Verify current pricing and rules directly with builders, lenders and planning authorities.