How to get a tiny home, step by step

General information only, not legal or planning advice. Where a rule is quoted, it is the New South Wales rule, used as a worked example; tiny home rules differ between states and are also interpreted by councils. Confirm with your council before buying.
Key NSW points at a glance
The first decisionOn wheels or on foundations — they fall under different laws[1]
On wheels, owner's landHousehold exemption reported for a member of the primary household[2]
Guest stays (on wheels)Reported cap of 2 consecutive days, 60 days a year[2]
Hard-plumbing a home on wheelsReported to remove its moveable dwelling status[2]
On foundationsTreated as a secondary dwelling: up to 60 m² on a lot of at least 450 m²[3]
Fast-track approvalAs little as 20 days; development application average 70 days[4]
*Rows citing specialist publishers report the position rather than quote the legislation.

A tiny home is not one thing in law. In NSW a building on foundations needs development consent under planning law, while a caravan-style dwelling on wheels is a moveable dwelling governed by the Local Government Act instead.[1] Which side you are on decides almost every later step — approval, who may live in it, how it connects to water, and how it is financed and insured.

So the sequence below starts with that choice, then runs through eight stages with a checklist for each.

The eight stages at a glance §

StageWhat you are settlingDetailed guide
1. Wheels or foundationsWhich legal route you are onOn wheels vs fixed
2. Who will live in it, and whereFull-time, family or guests; whose landLiving in a tiny house full-time
3. Check your state and councilWhat the rules allow on that landTiny home rules by state
4. Budget and financePrice, site costs, how to payTiny home costs by state
5. ServicesWater, power, wastewaterOff-grid systems
6. Choose and check a builderLicence, inclusions, contractChoosing a prefab builder
7. ApprovalExemption, section 68 or planning approvalTiny home rules in NSW
8. Delivery, insurance and moving inSiting, cover, handoverTiny home insurance

Stage 1: Wheels or foundations §

Decide this first. A tiny home on wheels can be quicker to place but carries limits on who may live in it and how it is serviced. A tiny home on foundations is a small house, with a small house's approvals.

Checklist:

Stage 2: Who will live in it, and where §

On wheels, NSW guidance reports a household exemption for a single tiny home on owner-occupied land, used by a member of the primary household, with casual guest stays reported as capped at two consecutive days and 60 days a year.[2] That reads as household use, not letting.

Checklist:

Stage 3: Check your state and council §

Rules differ by state and are applied by councils. For a fixed tiny home in NSW, the secondary dwelling limits apply: up to 60 m² on a lot of at least 450 m², one per property.[3]

Checklist:

Stage 4: Budget and finance §

Tiny homes are often harder to finance than houses, especially on wheels, so check finance before choosing a model.

Checklist:

Stage 5: Services §

How the home connects to water and sewer can change its legal status. NSW guidance reports that hard-plumbing a home on wheels into permanent water or sewer networks removes its moveable dwelling status and triggers a section 68 approval.[2] Installing a septic tank or other on-site waste system also generally needs section 68 approval.[5]

Checklist:

Stage 6: Choose and check a builder §

For a fixed tiny home built on your land, NSW rules on residential building work apply: a written contract over A$5,000 including GST, a deposit of no more than 10 percent, and Home Building Compensation cover before any deposit on contracts over A$20,000.[6] In NSW the licence search runs by name, licence number or ABN.[7]

Checklist:

Stage 7: Approval §

Which approval applies depends on Stage 1. A home on foundations goes through the planning system; in NSW, a proposal that meets the complying development standards can be approved in as little as 20 days, against an average of 70 days for a development application.[4] Installing a moveable dwelling that is not covered by an exemption generally needs a section 68 approval from council.[5]

Checklist:

Stage 8: Delivery, insurance and moving in §

Checklist:

What is not covered here §

Trailer registration, towing limits and road rules for tiny homes on wheels are not covered by the sources compiled here. Nor is whether NSW home building contract and insurance rules apply when a finished tiny home on wheels is bought as a product rather than built on your land; ask NSW Fair Trading or a solicitor.

Rules for states other than New South Wales are not set out on this page; see the state rules pages. The NSW household exemption and plumbing points are reported by a specialist publisher rather than quoted from the legislation, so confirm the current position with your council.

The Dispatch — a monthly email when new guides are published. No noise; unsubscribe anytime.

Sent to info@modularlivingaustralia.com.au and handled by a person. See Privacy.

References §

  1. Whiteacre — Planning law practice article, November 2024. Development consent under the Environmental Planning and Assessment Act 1979 is required for the erection of a building; moveable dwellings are governed instead by the Local Government Act 1993, and a caravan or manufactured home falls within the definition of a moveable dwelling. Development consent may separately be required for the use of a dwelling. Commercial legal commentary. whiteacre.com.au/tiny-homes-caravans-and-manufactured-homes-in-nsw-planning-law-part-2
  2. Alternative Housing Australia — Tiny home regulations, Queensland and NSW comparison (revised July 2026). Reports a NSW household exemption allowing a single towable tiny home to be occupied on owner-occupied land without council approval where used by a member of the primary household, with casual guest stays capped at two consecutive days and 60 days per year, and that hard-plumbing a mobile dwelling into permanent water or sewer networks removes its moveable dwelling status and triggers a section 68 approval. Commercial publisher, not the legislative text. alternativehousingaustralia.au/blog/tiny-home-rules-and-regulations-in-queensland/
  3. Wollongong City Council — Granny flats. A secondary dwelling sits on the same property as a single existing home with at least 450 m² of land, has no more than 60 m² of floor area, and only one is permitted per property. wollongong.nsw.gov.au/plan-and-build/building-and-renovating/common-residential-improvements/granny-flats
  4. NSW Department of Planning, Housing and Infrastructure — Complying development. Fast-tracked approvals can be issued in as little as 20 days, compared with an average development application determination time of 70 days. planning.nsw.gov.au/assess-and-regulate/development-assessment/planning-approval-pathways/complying-development
  5. NSW Planning Portal — Section 68 approvals. Activities generally requiring approval under section 68 of the Local Government Act include installing a manufactured home, moveable dwelling or associated structures, and installing or altering a waste treatment device or a human waste storage facility such as a septic tank. planningportal.nsw.gov.au/development-and-assessment/additional-approvals-applications/section-68-approvals
  6. NSW Government (Building Commission NSW) — Contracts for residential building work, last updated 29 April 2026. A written contract is required for residential building work where the price is over A$5,000 including GST; the maximum deposit is 10 percent; contracts over A$20,000 need a Home Building Compensation certificate, and no deposit may be requested before required cover is in place. nsw.gov.au/housing-and-construction/building-or-renovating-a-home/preparing/contracts
  7. Service NSW — Check a builder or tradesperson licence. The search can be run by name, licence number or ABN. service.nsw.gov.au/transaction/check-a-builder-or-tradesperson-licence

Figures are as published by the sources above at their respective dates and are paraphrased summaries, not verbatim reproductions. Verify current pricing and rules directly with builders, lenders and planning authorities.